Nhà> Blog> Solar Mounting Structure for Solar Energy Panel Mounting

Solar Mounting Structure for Solar Energy Panel Mounting

May 04, 2024
Snow Load: 1.4kn/M2
Product: Solar Mounting Structure for Solar Energy Panel Mo
Trademark: SP
Transport Package: Shrinking Film, Carton, Wooden Pallet or by Custom
Specification: galvanized steel
Origin: China
HS Code: 76109000
Product: Solar mounting structure for solar energy panel mounting
1.Enables easy,fast and cost-effective installation.
2. Flexible post spacing withstands different wind&snow loads.
3. High quality material in galvanized steel , Aluminum and SUS 304.
4. Highly corrosion resistant surface treatment.
5. Screws and nuts go with every componts needed.
6. Fasteners and rail nut fully configured to save extra parts purchasing.
7. Mechanical calculation and reliability tested to ensure highset product quality.
8. 12-25 years system and structural guarantee.


Specification:
Type: Solar mounting structure for solar energy panel mounting
Installation site: According to your requirements
Material: Galvanized steel
Fasten material: Aluminum , SUS304, Steel
Survival Wind Speed: < 60m/s 
Design Snow load: Up to 1.4KN/ Square meters
Solar panel type: Framed or Frameless
Panel Orientation: Transverse or vertical
Design Standard: CE;IOS9001;SGS
Quality warranty: 12-25 years
Duration: More than 20 years
Delivery time: 7-15 days
Package: Standard Packing
Solar Mounting Structure for Solar Energy Panel Mounting

Classic Mounting solution:
Solar Mounting Structure for Solar Energy Panel Mounting
Our factory:
Solar Mounting Structure for Solar Energy Panel Mounting

Contact us now 
In order to help you get the right system, please offer the following necessary info:
1. Dimension of solar panels(length*width*thickness)?
2.Solar panels array?
3. Where to install (which kind of rooftop or ground)?
4. Tilt angle?
5. Any requirements about wind load and snow load?


.Delivery & shipment:
Solar Mounting Structure for Solar Energy Panel Mounting

FAQ

Q1: What is your MOQ? 
A: 500kg for general products.  More than 5 tons for new products.

Q2: Can you produce aluminum profiles by drawing?
We have professional engineer to design CAD drawing and establish mould according to customers' requirement.

Q3: What certification do you have? What's your standard?
A: We have ISO certification. Our standard is DIN, AAMA, AS/NZS, China GB.

Q4: What's the delivery time for samples and mass production?
A: (1). 2-3 weeks to open the new moulds and make free samples.
     (2). 3-4 weeks after receipt of deposit and confirmation of the order.

Q5: What's the packing way?
A: Commonly we use shrink films or kraft paper, also we can make as per customers' requirements.

Q6: What's the payment terms?
A: Usually by T/T, 30% deposit and the balance paid before shipment, L/C is also acceptable.

Solar Mounting Structure for Solar Energy Panel Mounting

 
Liên hệ chúng tôi

Author:

Mr. li jack

E-mail:

59314843@qq.com

Phone/WhatsApp:

+8618915326526

Sản phẩm được ưa thích
Blog News
You may also like
Related Categories

Gửi email cho nhà cung cấp này

Chủ đề:
Thư điện tử:
Tin nhắn:

Your message must be betwwen 20-8000 characters

Liên hệ chúng tôi

Author:

Mr. li jack

E-mail:

59314843@qq.com

Phone/WhatsApp:

+8618915326526

Sản phẩm được ưa thích
Blog News
We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Gửi